01Design and shop drawings
Coordinate panel layouts, openings, connections, and the structural design before manufacturing. SIPA design guidance notes that performance depends on more than a stated R-value and includes coordination topics such as HVAC systems and shop drawings.
02Ventilation and HVAC
A tight building envelope needs planned mechanical ventilation. Your HVAC professional should size equipment using the actual home design, climate, and envelope performance.
03Site preparation and installation
Plan access, unloading equipment, dry storage, foundation accuracy, and the assembly sequence with your builder. Follow the specified connections and sealing details.
04Electrical and plumbing
Coordinate services during design. Electrical chases and trade routes need planning; avoid unapproved cuts to structural panels.
05Assembly and connections
Structural panels work as a system. Support conditions, splines, fasteners, sealants, and roof support details must follow the engineered package and manufacturer instructions.
06Comfort and indoor air
A well-detailed SIP envelope can help limit uncontrolled air movement. Mechanical ventilation, moisture management, and the selected windows and equipment remain part of the whole-home design.